Design standards for the maintenance and rehabilitation of older, existing structures. Residential civil and building site south placer fire. Results of all the tests above, conducted by an aashto accredited testing lab shall be submitted to the dces along with the installation drawings. Design and provide new manual dry class icombination automatic wet. By authority of the united states of america legally binding document by the authority vested by part 5 of the united states code 552a and part 1 of the code of regulations 51 the attached document has been duly. Residential civil and building site south placer fire district. H20 and hs20 loading 8000 lbs 32,000 lbs h20 loading 8000 lbs 32,000 lbs hs20 loading 32,000 lbs 8002331510 dynamic load sample calculation wheel load wl 16,000 lbs 32,000 lb axle 2 dynamic force fd 1.
Portions of 2010 fire code of new york state fire service features 501. Seattle dpd 2012 seattle fire code, chapter 5 fire. Projects up to 124,000 square feet shall have a single approved fire apparatus access road when all buildings have approved sprinklers. The slope is to be between 50 and 70 degrees from the horizontal. Buy nfpa 502, standard for road tunnels, bridges, and. Fire department access is required for all new structures. For the purpose of this standard, tunnel length shall dictate the minimum fire protection requirements. The purpose of this recommended practice is to assist fire departments in developing training programs and planning effective operations for supporting certain fixed fire protection systems in buildings in which fire can occur.
Chapter 560 site utilities washington state department. Manual opening gates shall not be locked with a padlock. Units, 4th edition includes 2008 and 2009 interim revisions. Future revisions will be displayed on aashto s website via a link from the titles book code listing, hb 17, in the bookstore of an email notification will also be sent to previous purchasers notifying them that a revision is available for download.
Bureau of fire prevention and life safety menlo park fire district. Class i standpipe and fire sprinkler systems as shown. Procedures manual for the accreditation of construction materials testing laboratories. The coast guard relies on mariner notification of discrepancies in bridge lighting and bridge fender and protection systems as well as other hazardous and nonstandard bridge conditions. In this regard, prior to may 1981, the coast guard annually. Aashto hl93 vehicular live load is a combination of three different loads. Every private bridge hereafter constructed or reconstructed due to damage, deterioration, or obsolescence shall be designed to support an imposed load of fire. The aashto accreditation program procedures manual for. Added load rating is required when a new feature is added to a bridge that increases or redistributes the existing permanent loads on a bridge.
Hl93 is a type of theoretical vehicular loading proposed by aashto in 1993. Manual for corrosion protection of concrete components in. Future revisions will be displayed on aashto s website via a link from the titles book code listing, hb17, in the bookstore of an email notification will also be sent to previous purchasers notifying them that a revision is available for download. Where a bridge or elevated surface is designed in a fire apparatus access road, then the bridge shall be constructed and maintained to aashto hb17 and designedfor a live load sufficient to carry a 75,000 lbs. All bridge structures shall utilize the american association of state highway and transportation officials aashto standard hb17, current adopted edition, for fire apparatus loads. The minimum fire protection and fire life safety requirements are based on tunnel length as categorized below. When a bridge is required to be used as part of a fire apparatus access road, it shall be constructed and maintained in accordance with standard aashto hb17. Origin and development of nfpa 502 a tentative standard, nfpa 502t, standard for limitedaccess highways, tunnels, bridges, and elevated structures, was prepared by the technical committee on motor vehicle fire protection and was adopted by the national fire protection association on may 16, 1972, at its annual meeting in philadelphia, pa.
The following are general requirements of the south placer fire protection. Aashto standard specification for highway bridges and must be designed for a live loading sufficient to carry the imposed loads of fire apparatus. Gannett flemings engineers perform equipment condition inspections and testing, and indepth inspections of subcomponents, such as bearings, relays, and motors. Aashto has develop an impact factor to increase the live load to account for the bounce and sway of vehicles. An email notification will also be sent to previous purchasers notifying them that a revision is available for download. Vehicle load limits shall be posted at each entrance to the bridge 503. Provide to the dces a list of bridge projects in which the. Aashto the american association of state highway transportation officials is a nonprofit, nonpartisan association representing highway and transportation departments in the 50 states, the district of columbia, and puerto rico. Where a bridge or an elevated surface is part of a fire apparatus access road, the bridge shall be constructed and maintained in accordance with aashto hb 17 as listed in rule 1. Recommended practices are given for the adequate support and use of sprinkler and standpipe systems. It is used as the design loading for highway structures in usa and other countries where aashto code is followed. Standard specifications for highway bridges english. For manual standpipe systems, a connection through which the fire department can pump.
Aashto hb17 american association of state highway and transportation officials, the. Chapter 560 site utilities wsf terminal design manual m 3082. For new bridge designs hb17 is superseded by the aashto lrfd bridge design specifications. Live loads for bridges in many cases, vehicles may bounce or sway as they move over a bridge. Most backordered items can be rushed in from the publisher in as little as 24 hours. Piarc fire and smoke control in road tunnels, world road association piarc, paris, 1999 european union directive 200454ec of the european parliament and of the. Nfpa 5022011 and 2008 edition standard for road tunnels. Aging equipment also can benefit from upgrades to improve energy efficiency and reduce maintenance. Bridges shall be no narrower than the driving portion of the road serving each end.
Regulations, standards and guidelines individual countries r eg u lat io n ss dr g. Vehicle load limits shall be posted at both entrances to bridges where required by the fire code official. The bridge shall be designed for a live load sufficient to carry the imposed loads of fire apparatus as stated herein. Aashto hb17 toc standard specifications for highway. Bridges and elevated surfaces shall be designed for a live load. Proposed homes that do not meet california fire code, section. These minimum requirements, which are more fully described within this standard, are summarized in table 7. Bridges designed for major ingressegress roads serving subdivisions or used as part of a fire apparatus access road shall be constructed and designed to meet standard, aashto hb 17. Fire service features for buildings, structures and premises shall comply with this chapter. Fire apparatus access roads shall be provided and maintained in accordance with sections.
Aashto hb17cdm standard specifications for highway bridges, 17th edition, network cdrom aashto lrfdus4m aashto lrfd bridge design specifications, customary u. Buildings equipped with a standpipe system installed in accordance. City of lynchburg site design requirements fire apparatus. Future revisions will be displayed on aashto s website via a link from the titles book code listing, hb17, in the bookstore of. Portions of 2010 fire code of new york state fire service.
All fire department connections installed for fire sprinkler and standpipe. It requires castings to maintain a proof load of 40,000 lbs applied on a 9in. This is the newest specification, first published by aashto in 1989 and completely revised in 2005. Vehicle load limits shall be posted at both entrances to bridges when required. Vehicle load limits shall be posted at both entrances to bridges where required by the fire. Manual for condition evaluation of bridges2000 edition vi. Manhole frame and cover load bearing definitions npca. Aashto hb17 american association of state highway and transportation officials, the 17th edition standard for highway bridges.
Bridges and elevated surfaces shall be designed for a live load sufficient to carry the imposed loads of fire apparatus. Where a bridge or elevated surface is designed in a fire apparatus access road, then the bridge shall be constructed and maintained to aashto hb 17 and designedfor a live load sufficient to carry a 75,000 lbs. The 2017 edition of nfpa 502, standard for road tunnels, bridges, and other limited access highways provides designers, engineers, ahjs, and state and federal regulators with the latest guidelines for the construction, operation, maintenance, and fire protection of these venues to mitigate hazards, maintain structural integrity, and protect lives. Buildings undergoing construction and alteration must comply with chapter 14 of the ifc. Vehicle load limits shall be posted at both entrances to bridges when. Bridges designed for major ingressegress roads serving subdivisions or used as part of a fire apparatus access road shall be constructed and designed to meet standard, aashto hb17. This manual shall serve as a supplemental instruction and interpretation. Vehicle load limits shall be posted at both entrances to bridges where required. American association of state highway and transportation.
570 1617 1026 633 1479 434 651 1131 645 224 1116 944 1049 743 1038 1540 720 830 145 57 1311 1588 1207 1324 42 114 339 222 30 1182 1502 835 1047 428 342 1156 1152 1126 977 407 1421 1018 213 376 257